Project Overview

The GBA Mission Critical team provided engineering, design and construction management services for adding and installing three generators. The project included coordination with multiple city organizations to handle crane permitting and installations. Due to the large crane size, there was a requirement to coordinate the shutdown of several thoroughfares in the heart of downtown Omaha, Nebraska, for 48 hours.

Although locating the crane necessary for the installation was standard, the reach required was unique due to the generators’ final location atop a parking garage. A 770-ton LieBehr crane with an extended reach was used to set the first and furthest generator. Due to the extended reach, the crane needed to be upsized to ensure all safety factors were met.

Trade partners were used for the electrical connectivity, fuel piping and software programming to complete the integration. A runtime and load bank test were conducted to ensure all items functioned properly.

PROJECT DETAILS
Client
1623 Farnam
Don't Wait, Reach Out
Discover How We Tailor Our Solutions to Meet Your Needs
Get In Touch
Safety is Our #1 Priority
Safety & Quality are at The Foundation of Every Project
We maintain an EMR below the industry average, implement and maintain zero-tolerance programs for unsafe practices within the workplace and strive for a zero-accident/injury goal. We develop safety procedures early in preconstruction based on your project goals and facility needs.
Learn More